battened
英 [ˈbætnd]
美 [ˈbætnd]
v. 用板条或压条固定; (损人利己地)养肥自己
batten的过去分词和过去式
过去式:battened
柯林斯词典
- N-COUNT (固定用的)板条,压条
Abattenis a long strip of wood that is fixed to something to strengthen it or to hold it firm.- ...a batten to support the base timbers.
用来支撑底部木头的板条
- ...a batten to support the base timbers.
- VERB 用板条(或压条)固定
If somethingis battenedin place, it is made secure by having battens fixed across it or being closed firmly.- The roof was never securely battened down.
屋顶板条一直没钉牢。 - ...big pine shutters that could be battened against the noonday sun.
钉上大块的松木窗板可以遮挡中午的太阳
- The roof was never securely battened down.
- tobatten down the hatches→ see:hatch
双语例句
- Analysis on the Stiffness Reduction Factors of Latticed and Battened Columns of Concrete Filled Steel Tube
钢管混凝土组合柱刚度折减系数分析 - Experimental study on ultimate load-carrying capacities of concrete filled steel tubular battened columns
钢管混凝土平缀管格构柱极限承载力试验研究 - Experimental research of the carrying capability of battened-beam structures under vertical load
缀板梁结构在竖向荷载下承载能力的试验研究 - THE OVERALL STABILITY OF A BATTENED PLATE COLUMN Construction practice of concrete filled steel tubular column
双肢缀板钢格构立柱的整体稳定分析钢管混凝土柱施工实践与体会 - In this paper, the construction techniques of the joined platform and hydraulic climb form for the double-shaft high-rise piers are presented. Elastic Stability Analysis and Modeling Test of Battened Column with Uniaxial Symmetry in Twin-wall Truss
介绍双肢高墩联体平台液压爬模施工技术。双肢格构式桁架中单轴对称缀板柱弹性稳定分析及模拟试验研究 - The cattle battened on the plentiful fodder. Different parts of clothing are well matched to make a harmonious comBination.
牲畜靠丰美的饲料养得膘肥体壮。搭配完美的服装,显得如此谐调合体。 - It illustrates concept of frame shear wall structure system, calculation of side-sway under horizontal load by battened wall theory is introduced, this mean is simple and which can be referred in similar structure.
阐述了框架剪力墙结构体系的概念,介绍了采用双肢墙理论计算框架剪力墙结构在水平荷载作用下的侧移,经实践证明,该方法简便快捷,可供类似结构计算借鉴。 - About 30 per cent of the families his organisation advised were in "Bunker mode" and had "battened down the hatches", while 40 per cent were "trying to work out a battle plan to get them back into their long-term strategy".
在该机构服务的家族中,约有30%采取“守势”并已“为暴风雨做好了准备”,而有40%正“试图制订作战计划,以使自己回到长期战略中来”。 - During the storm in the passage to the Cape of Good Hope, the hatches of the ship were battened down.
在驶向好望角的途中遇到暴风雨时,每个舱口都被封上了。 - An easy analytic solution to high rise singal span frames and battened shear walls
高层单跨框架和双肢剪力墙的简便解析解