constrains
英 [kənˈstreɪnz]
美 [kənˈstreɪnz]
v. 强迫; 强制; 迫使; 限制; 限定; 约束
constrain的第三人称单数
柯林斯词典
- VERB 约束;限制;强迫
Toconstrainsomeone or something means to limit their development or force them to behave in a particular way.- Women are too often constrained by family commitments and by low expectations...
女性往往受到家庭责任和低期望值的束缚。 - How can we produce top-class engineers when universities are constrained to offer salaries that can only attract mediocre staff?...
大学的财力有限,提供的薪酬仅能吸引水平一般的教师,在这种情况下,我们如何能培养出一流的工程师? - It's the capacity of those roads which is going to constrain the amount of travel by car that can take place.
制约驾车出行量的将会是那些道路的通行能力。
- Women are too often constrained by family commitments and by low expectations...
- PHRASE 觉得被迫(做某事)
If youfeel constrained todo something, you feel that you must do it, even though you would prefer not to.- For some reason he felt constrained to lower his voice.
不知怎么的,他觉得自己必须得压低声音。
- For some reason he felt constrained to lower his voice.
双语例句
- We'll ignore the continuity constrains.
我们往往忽略连续约束条件。 - Obviously, this constrains the portability of a compiled GWT Web application.
显然,这限制了编译后的GWTWeb应用程序的移植性。 - College English teaching environment refers to a system of multidimensional space and multiple factors that constrains and controls the teaching, the existence and the development of english.
摘要大学英语教学环境是指对大学英语教学的发生、存在和发展产生制约和控制作用的多维空间和多元因素的环境系统。 - Sizing and scoping drives every aspect of the project, constrains the actions that can be taken in the development or upgrade of a product, and limits available options.
确定规模和范围是驱动项目各个方面的动力,约束那些在产品的开发和升级中所采用的行动,以及限制可以提供的选项。 - A business rule is a high-level statement that describes, constrains, or controls some aspect of your business.
业务规则是一种高级声明,用于描述、约束或控制业务的某些方面。 - Generating subdivision surfaces with complicated curve interpolation constrains is a concerned topic for computer graphics and geometric modeling.
带有复杂型曲线插值约束的细分曲面的生成,是计算机图形学及几何造型技术等领域所关心的一个问题。 - Study on Production Planning& Control Method Based on Theory of Constrains
基于约束理论的瓶颈作业计划与控制方法研究 - Research of the job-shop scheduling problem with due date and capacity constrains
基于交货期和设备能力约束的作业车间调度方法研究 - In this paper a new exact algorithm is proposed for solving project scheduling problems under multiple resource constrains which is based on the branch and bound procedure.
基于分支定界法的思想提出了一种新的精确求解多资源约束下项目进度规划问题的最优化算法。 - Constrains on the new system such as timing, financial, staffing constrains should be identified.
对新系统的种种规定,如时间安排、经费、和人员的规定都应明确。
