找词语>英语词典>estimations翻译和用法

estimations

英 [ˌɛstɪˈmeɪʃənz]

美 [ˌɛstəˈmeɪʃənz]

n.  判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数

柯林斯词典

  • N-SING 评价;看法;判断
    Yourestimationof a person or situation is the opinion or impression that you have formed about them.
    1. He has gone down considerably in my estimation.
      我对他的评价已经一落千丈。
    2. ...Lee Dixon, the best player on the pitch in his manager's estimation.
      教练心目中球场上最好的球员李·狄克逊
  • N-COUNT 估算;估价
    Anestimationis an approximate calculation of a quantity or value.
    1. In fact, the first group were absolutely correct in their estimation of this man's height.
      事实上,第一组人对这名男子身高的估计完全正确。
    2. ...estimations of pre-tax profits of £2.25 million.
      估计税前利润达225万英镑

双语例句

  • Thus, with UCPM user acceptance or systems integration, teams will be able generate more accurate estimations much earlier than the other test phases.
    因此,有了UCPM用户的验证或者系统的整合,团队就能够生成更精确的比其它测试阶段更早的评估。
  • Parameter Estimations of Multi-Dimensional Correlation Coefficient Stationary Series Based on MCMC
    基于MCMC的多维相关系数平稳序列
  • The rotor angular velocity is calculated with the observed estimations, including the rotor angular velocity, to realize the speed sensorlesss control.
    并用含转子角转速的观测估计值算出转子角转速,实现了无速度传感器控制。
  • The consistency and asymptotic normality of the estimations have been proved. Moreover, statistic on testing equality of two exponential distributions and its limit distribution are given.
    证明了估计的强相合性以及渐近正态性,给出了检验两总体参数相等的检验统计量及检验统计量的极限分布。
  • The obvious question becomes: Why are software engineers so incapable of accurate estimations?
    问题来了:为什么无法对软件工程进行精确的评估呢?
  • One could then focus on the fundamentals as projected by the earnings estimations.
    然后可以将重点定位在盈利预测基本因素上。
  • Prepare detailed written reports that estimate property values, costs, outline methods by which the estimations were made, and meet appraisal standards.
    准备详细的书面报告,估计属性值,成本,概述的方法,估算了,并满足评价标准。
  • Annotate the problem query with relevant statistics to better understand what the DB2 optimizer is using for its estimations.
    使用相关统计数据来注释有问题的查询,这样可以更好地理解DB2使用哪些内容来进行评估。
  • High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
    因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。
  • Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
    关于线性模型中误差方差估计的收敛速度的若干注记